top of page

When an Old Reserve Fund Study No Longer Reflects Your Building

Jun 5, 2025
2 min read
Low-angle view of a tall office tower against a bright red graphic background with the word FEES visible.

A reserve fund study may still be technically current and yet no longer tell the full financial story.


Perhaps a garage project expected three years from now suddenly needs attention. Maybe contractor pricing comes back substantially higher than the amount in the study, or an unexpected mechanical failure consumes money that had been expected to remain in the fund. In situations like these, directors should consider whether a reserve fund study update is needed sooner than expected.


Three Years Can Be a Long Time

Ontario requires condominium corporations to conduct reserve fund studies periodically. O. Reg. 48/01 generally establishes a three-year cycle between required studies. That does not mean directors should ignore significant changes that occur between those dates.


A reserve fund study is based on conditions, estimates and financial assumptions available when it is prepared. If those assumptions change materially, the projection may become less useful for decision-making.


Recent Ontario experience provides a clear example of why assumptions matter. In its Reserve Fund Survey Findings, the CAO reported that inflation assumptions supplied by responding corporations were generally higher in reserve fund studies completed in 2022 and 2023 than in 2021. The CAO also noted the unusually high inflationary environment as one limitation of the survey.


Actual Tender Prices Can Change the Picture

Imagine a reserve fund study carrying $800,000 for a project several years away. The corporation begins planning and receives professional estimates or tenders showing that the work could cost considerably more. The board now has information that did not exist when the study was prepared. Simply waiting for the next scheduled update may leave directors making budget decisions using assumptions they already know have changed.


An interim or “mini” update can be useful when unexpected projects or actual tender prices materially change the reserve fund picture. This terminology is a practical description, not a separate statutory class of reserve fund study.


Boards Can Obtain Additional Studies

Ontario’s reserve fund framework establishes required periodic studies, but it does not mean a corporation can only review its reserve plan on those dates. The Condominium Act provides the statutory framework for determining whether reserve money and contributions are adequate for expected major repair and replacement costs.


Even without immediately commissioning a full additional study, directors can speak with the existing reserve fund provider about how a major change affects the cash flow.


Update the Plan When Reality Changes

A reserve fund study update should not be viewed merely as another compliance exercise. Its value comes from keeping the corporation’s long-term financial assumptions reasonably connected to the actual building.


If major new information arrives, boards should ask what it means for future projects, contributions and the reserve balance. Waiting for the calendar to trigger that conversation may be easy, but good financial governance means responding when the building provides new information, not only when the next statutory deadline arrives.


Listen to the podcast and learn more: YouTube | Spotify | Apple Podcasts | Amazon Music | iHeartRadio 

Comments


bottom of page