Reserve Fund Studies Aren't Enough: Why a Targeted Pre-Design Assessment Saves Condo Corporations Money
A reserve fund study is a legal requirement and a useful long-term funding and component-planning document. It should not automatically be treated as a detailed diagnostic assessment of every individual system. Because reserve-fund projections are estimates, boards may wish to obtain more detailed project-specific condition and pricing information as major work approaches.

In City Site’s podcast “Ontario Fire Code Changes Condo Boards Need To Know in 2026” with Sam Soltani of The Trace Group, we discuss exactly why a targeted pre-design assessment can improve major fire safety and building-system decisions, alongside other reserve planning, project scope, and avoiding costly surprises. The podcast explains why a long-range reserve plan does not always provide enough detail for a complex project.
Its practical perspective helps boards see when a focused assessment can reduce uncertainty before design, tendering, and construction begin. Check out more information about this podcast here: #WeSpeakCondo podcast
What a Reserve Fund Study Actually Provides
The reserve fund study provides the corporation's required long-term reserve-funding framework. Its level of investigation differs from a detailed system-specific assessment, which may be appropriate for a major component nearing repair or replacement. The study should not be dismissed as a "bare minimum".
What a Targeted Assessment Adds
A targeted or pre-design assessment focuses on one system in greater detail. It may examine actual condition, remaining life, repair-versus-replacement options, compatibility, and project scope. In the fire-alarm context, repair, hybrid, and full-replacement options can differ substantially in cost depending on devices, wiring, and existing-system condition.
Assessment fees vary by building, system, and consultant. A detailed assessment may reduce scope uncertainty and improve bid comparability, but savings are project-specific and should not be guaranteed. Boards should obtain a written scope and fee proposal before budgeting for this work.
When to Commission One
A targeted assessment is worth considering when a major replacement is approaching, when a contractor reports a deficiency the board cannot price confidently, or when the board needs more detailed condition information before tendering. The timing should be based on the project and reserve-fund planning cycle rather than a universal two- or three-year trigger.
Spend Small, Bid Smart, Fund Accurately

The governing principle is sequencing: understand the system, define the project, obtain comparable pricing, and integrate updated information into reserve-fund planning. A reserve fund study provides long-term planning estimates, while a targeted assessment can add project-specific detail. Contact City Sites Property Management to discuss coordination needs and request a proposal.
For a deeper discussion of why a targeted pre-design assessment can improve major fire safety and building-system decisions, listen to the full #WeSpeakCondo episode with Sam Soltani of The Trace Group. The conversation adds useful perspective on reserve planning, project scope, and avoiding costly surprises, and is a helpful companion to this article.